HCIP-DCF- Deployment Training

الوصف

Objectives

On completion of this program, the participants will be able to:

  •  Describe the history of the Data Center
  •  Describe the main issues of data center design and maintenance
  •  Describe the future development of the data center
  •  Describe the power distribution structure of FM2000
  •  Describe the power distribution structure of FM1000
  •  Describe the power distribution structure of FM800
  •  Describe the features of UPS2000
  •  Perform the installation of UPS2000
  •  Perform the commissioning of UPS2000
  •  Perform the routine operation and troubleshooting of UPS2000
  •  Describe the features of UPS5000
  •  Perform the installation of UPS5000
  •  Perform the commissioning of UPS5000
  •  Perform the routine operation and troubleshooting of UPS5000
  •  Describe the features of Integrated UPS5000
  •  Perform the installation of Integrated UPS5000
  •  Perform the commissioning of Integrated UPS5000
  •  Perform the routine operation and troubleshooting of Integrated UPS5000
  •  Describe the features of storage battery
  •  Perform the installation of storage battery
  •  Perform the routine operation and troubleshooting of storage battery
  •  Describe the features of Integrated PDU8000
  •  Describe cooling solutions commonly used in the data center
  •  Describe Huawei air conditioner products series
  •  Describe the features of NetCol5000-A and NetCol8000-A
  •  Perform the installation of NetCol5000-A and NetCol8000-A
  •  Perform the commissioning of NetCol5000-A and NetCol8000-A
  •  Perform the troubleshooting of NetCol5000-A and NetCol8000-A
  •  Describe monitoring system solutions commonly used in the data center
  •  Describe Huawei monitoring system solution
  •  Describe the Major hardware products and functions of Huawei monitoring system
  •  Describe the Software structure and main functions of NetEco
  •  Create modular DC on NetEco
  •  Perform the basic operation function of NetEco
  •  Perform the basic alarm and troubleshooting of NetEco
  •  Describe the realization of fire system
  •  Describe the structure and main components of fire system

Training Contents

HCIP-DCF- Deployment Training

  •  General introduction to Data Center Facility
    •  Data Center facility development
    •  Data Center facility main parameters
    •  Data Center facility development trend
    •  Huawei Data Center facility introduction
    •  Huawei Data Center facility solutions introduction
  •  Power Distribution System Solution
    •  FM series product Power distribution structure introduction
    •  UPS2000 series product introduction
    •  UPS2000 series product installation and commissioning
    •  UPS2000 series product troubleshooting
    •  UPS5000 series product introduction
    •  UPS5000 series product installation and commissioning
    •  UPS5000 series product troubleshooting
    •  Battery application and maintenance knowledge
    •  PDU8000 series product introduction
    •  PDU8000 series product troubleshooting
  •  Cooling System Solution
    •  Cooling System introduction
    •  Main components of the cooling system introduction
    •  Huawei precision air conditioner product introduction
    •  NetCol5000A and NetCol8000A series product introduction
    •  NetCol5000A and NetCol8000A series product installation and commissioning
    •  NetCol5000A and NetCol8000A series product troubleshooting
    •  NetCol5000C and NetCol8000C series product introduction
    •  NetCol5000C and NetCol8000C series product installation and commissioning
    •  NetCol5000C and NetCol8000C series product troubleshooting
  •  Monitoring System Solution
    •  Mainstream monitoring system structure introduction
    •  Huawei monitoring system structure introduction
    •  Huawei hardware of monitoring system introduction
    •  ECC800 product introduction
    •  NetEco functions introduction
    •  NetEco creation introduction
  •  Introduction to Other System
    •  Fire extinguishing system introduction
    •  Huawei fire extinguishin system introduction